1. Showing driveway excavation with minidigger

 

2. Showing prepared path area and kerbsett retaining edgeings in position.

 

3. Excavating paths

 

4. Showing kerbsett steps under construction, kerbsett edgings and new drainage hopper top in position.

 

5. Installing concrete into prepared area

 

6. Showing excavated driveway and original manhole in situ

 

7. Showing retaining wall in country stone walling.

 

8. Installing concrete into prepared area

 

9. Colour being applied to surface

 

10. Concrete colour being applied and "floated" into surface

 

11. Concrete in situ ready to colour and print, note plastic sheeting to keep work area clean and tidy.

 

12. Printing concrete in progress

 

13. Printing concrete in progress

 

14. Printing concrete in progress

 

15. New steps coloured and printed

 

16. Concrete being release agent washed, exspansion joints cut prior to this.

 

17. The final process is application of sealant

 

18. Showing finished steps and paths.

 

19.Showing finished steps and path

 

20. Showing finished path, steps and wall.

 

21. Showing finished driveway.

 

22. Showing finished driveway.